07.21.2010

We are going to tackle the announcer booth floor this Thursday evening July 22, 2010 at 6:00 p.m. There is a section of the floor that needs to be replaced (approximately 4 to 8 sheets of plywood) due to it rotting. The roof was fixed last season and no longer leaks. We will be pulling out the bad plywood and replacing with new.

What is required:
1. PEOPLE
2. Hammers
3. Small crow bars for removal of nails

Alan Beal will be leading this project and will bring the necessary power tools.

PLEASE COME OUT AND LEND A HAND.

This is the first phase of this project. Once this is completed we will (at a later date) cover the floor with peel-and-stick flooring and hang four (4) ceiling fans.

Looking forward to seeing everyone,

Thanks in advance and as always,

GO MUSTANGS!

Steve Iapicco