Hello everybody,
You are needed this Saturday July 31st at 8:00 a.m. at the Field House (locker room at the east end of the practice field).

The old lockers have been pulled out and we need to do the preparation work for the new ones to be installed for both the varsity and freshman rooms. Alan Beal has pre-fabbed the locker bases and they will need to be installed along with 2 X 4′s on the wall. For this project we will need:

1. PEOPLE.
2. Drills that can drill into masonary block.
3. Screw guns.

The second part of the project that needs to be done on Saturday is the cutting in on the edges of the floors with new floor paint. The cleaning of the floors will be completed by Saturday. We will be painting the ENTIRE locker room floor with the exception of the coaches and trainers rooms. This means the varsity / jv room, bathrooms, and the freshman room. For this portion of the project we will need:

1. PEOPLE (Ladies, perfect opportunity to see the locker room and work on a project that is in an air conditioned environment!) 2. Did I already mention people?

If we can get all of the edges cut in then the floor can be rolled during the week when no-one is around and will go very quickly.

We are getting close to the start of practice and need to get these two things done. Alan Beal will be leading this project.

Thank you in advance!

As always,

GO MUSTANGS!!

Steve Iapicco

07.21.2010

We are going to tackle the announcer booth floor this Thursday evening July 22, 2010 at 6:00 p.m. There is a section of the floor that needs to be replaced (approximately 4 to 8 sheets of plywood) due to it rotting. The roof was fixed last season and no longer leaks. We will be pulling out the bad plywood and replacing with new.

What is required:
1. PEOPLE
2. Hammers
3. Small crow bars for removal of nails

Alan Beal will be leading this project and will bring the necessary power tools.

PLEASE COME OUT AND LEND A HAND.

This is the first phase of this project. Once this is completed we will (at a later date) cover the floor with peel-and-stick flooring and hang four (4) ceiling fans.

Looking forward to seeing everyone,

Thanks in advance and as always,

GO MUSTANGS!

Steve Iapicco

07.08.2010

All,
I hope everyone had a great Independence Day weekend. We will be holding the July meeting at 7pm next Tuesday, July 13, 2010. The reason for the date change was because of the holiday and on Monday night the boys and coaches will be at the 7 on 7 passing league in Cocoa.

The meeting will take place in the FIELD HOUSE (locker room at end of practice field). Please come out and see the new ceilings and the plans for the new lockers and floors. The reason for the meeting to take place here is the air conditioning is off in the cafeteria, but is on in the field house.

The Coach should have an update on Freshman sports.

We will be setting dates for the remaining projects and need participation to get these done. We have a lot to do before the season starts and the weeks are running out.

Please come out and support the boys.

As always,
GO MUSTANGS!

Steve Iapicco